Tamamlanmış Mekanik Projeler

CLIENT LOCATION JOB DESCRIBTION CONTRACT DATE COMPLETION DATE CONTRACT AMOUNT AUTHORIZED PERSON POSITION CONTACT NO
PİLENPAK AMBALAJ SAN.TİC.A.Ş. MANİSA-TURKEY PRODUCTION AND INSTALLATIONS OF VENTILATION UNIT 02.11.2000 7E+09 Savaş ORHON TECHNICAL DIRECTOR (0236) 233 25 01
MAN B&W GAZİANTEP-TURKEY SANKO ENERGY POWERPLANT MECHANICAL INSTALLATIONS 25.11.2000 685451 Mr.KLUG    Mr.STÖCKLER PROJECT MANAGER FİNANSMAN MANAGER (49) 821 322 2033
ORDİNAT İNŞ.ELEK.MAK. TAAH. SAN. TİC. LTD. ŞTİ.TEPE ALTYAPI İNŞ.YÖN.MÜM.MÜT.A.Ş. DENİZLİ – TURKEY 37 MW KOJENERASYON POWERPLANT MECANICAL INSTALLATIONS 36892 1216000 DM
 120.000.000.000
Süleyman ÇOLAKOĞLU            Cavit TUNCER GENERAL MANAGER  PROJECT DIRECTOR (232) 461 07 08 (312) 266 12 18
ENER ENERJİ ÜRT.SİS.İNŞ.TAAH.SAN.A.Ş. ÇAN - ÇANAKKALE – TURKEY ŞAN THERMAL POWERPLANT MECHANICAL INSTALLATIONS 36984 5E+11 Bülent ÖZGÜREL GENERAL MANAGER (312)436 57 17
İLTEKNO İLERİ TEK.MÜH.A.Ş. GAZİANTEP – TURKEY 2 x 10,6 MW KOJENERASYON POWERPLANT MECHANICAL INSTALLATIONS 37025 225000 Gürcan GÜREL                         Emre İLKİN GENERAL MANAGER         PROJECT MANAGER (212) 296 77 40
ENER ENERJİ ÜRT.SİS.İNŞ.TAAH.SAN.A.Ş. MANİSA – TURKEY 54 MW KOJENERASYON POWERPLANT MECHANICAL INSTALLATIONS 01.01.2001 85000 Bülent ÖZGÜREL GENERAL MANAGER (0312)436 57 17
ENER ENERJİ ÜRT.SİS.İNŞ.TAAH.SAN.A.Ş VAN – TURKEY 20 MW KOJENERASYON POWERPLANT MECHANICAL INSTALLATIONS 01.01.2001 500000 Ömer BAŞBUĞA POWER HOUSE DIRECTOR (432) 223 50 96
RASA RADYATÖR SAN.A.Ş. MARDİN – TURKEY 34 MW ENERJİ POWERPLANT MECHANICAL INSTALLATIONS 08.02.2001 500000 Mehmet KAZANCI GENERAL MANAGER (212) 550 53 36
SELKASAN KAĞIT FABRİKASI MANİSA – TURKEY 500 M 10" 21 TON/H PRODUCTION AND INSTALLATION OFSTEEL CONSTRUCTION  11.09.2001 6.5E+10 Güven GÜRTUNCA VIEWPOINT AND ENGINEER CHIEF (0236) 233 04 03
AKSA ENERJİ ÜRETİM A.Ş. SAMSUN – TURKEY 7 MACHİNE 100 MW POWER PLANT MECHANICAL INSTALLATIONS,PIPING AND STEEL CONSTRUCTIONS  11.04.2002 188810 Kaan GÖRENEK MECHANICAL ENGINEER (0212) 550 53 36
BURSA DOĞALGAZ KOMBİNE ÇEVRİM POWER HOUSEI BURSA – TURKEY INSTALLATION OF TRANSFORMING NATURAL GAS SYSTEM  08.11.2002 1.35E+11 Y.Haydar BOZKAYA MANAGING DIRECTOR (0224) 267 11 70
AKFEN İNŞAAT TURİZM VE TİCARET A.Ş. PETKİM - ALİAĞA - İZMİR – TURKEY PETKİM WATER TREATMENT UNIT,  EXTRA SEDİFLOKS CONST. MECHANICAL INSTALLATIONS, CARBON STEEL PIPE PRODUCTION AND EQUIPMENT INSTALLATION. PLUMBING, VENTILATION SYSTEM, HEATING SYSTEM AND STEEL CONSTRUCTION 37622 2.089.148,37 USD SERDAR ÇOLAKOĞLU PROJECT MANAGER (232) 461 07 08
 VESTEL BEYAZ EŞYA SAN.TİC.LTD.ŞTİ. MANİSA – TURKEY WASHING MACHINE FACTORY MECHANICAL INSTALLATIONS AND PIPING 37692 3.82E+11 Hakan DİLAN MECHANICAL ENGINEER (236) 226 31 04
MANİSA TİC.VE SANAYİ ODASI MANİSA – TURKEY STEEM KONDENS LINE 37747 1.8E+11 Güven GÜRTUNCA MECHANICAL ENGINEER (236) 213 02 20
BAKİŞ YAPI İNŞAAT SAN.VE TİC.A.Ş. İZMİR – TURKEY BOPP BUILDING STEEL CONSTRUCTION INSTALLATIONS 37756 1.72E+11 Ender ÖZMERGEN MECHANICAL ENGINEER (236) 376 79 70
NATO KARARGAHI SATINALMA VE KONTRAT ŞUBESİ KEMALPAŞA - İZMİR – TURKEY NATO DISCO BUILDING STEEL CONSTRUCTION INSTALLATIONS 37778 7.95E+09 Mehmet BÜYÜKNİSAN MECHANICAL ENGINEER (232) 411 15 41
NATO KARARGAHI SATINALMA VE KONTRAT ŞUBESİ İZMİR – TURKEY NATO BUILING HOT WATER LINE 37780 5.52E+09 Mehmet BÜYÜKNİSAN MECHANICAL ENGINEER (232) 411 15 41
NATO KARARGAHI SATINALMA VE KONTRAT ŞUBESİ İZMİR – TURKEY SPLIT AIR-CONTION LINE 37816 8.63E+09 Mehmet BÜYÜKNİSAN MECHANICAL ENGINEER (232) 411 15 41
BOSCH ISITMA ÜRÜNLERİ A.Ş. MANİSA – TURKEY FACTORY BUILDING VENTILATION, PIPING, MECHANICAL INSTALLATIONS AND STEEL CONSTRUCTION 22.05.2003 110547.7 Levent ALKAN MECHANICAL ENGINEER (236) 226 12 22
KAREGE KARADENİZ EGE ELEKTRİK ÜRETİM A.Ş. KEMQALPAŞA - İZMİR – TURKEY 34 MW ENERGY POWERPLANT MECHANICAL INSTALLATIONS  38140 4.68E+10 ÇORUH ÇELİKBİLEK PROJECT MANAGER 0 212 295 47 37
YENİ TEKNİK YAPI A.Ş. MANİSA – TURKEY STEEL CONSTRUCTION BUILDING PRODUCTION AND INSTALLATION 38170 4.35E+10 ORKUN SOYSAL PROJECT MANAGER (236) 213 08 00
TEPE İNŞAAT A.Ş.  ARDAHAN – TURKEY BTC PROJECT ARDADAN-ERZURUM-ERZİNCAN SİVAS PUMP STATIONS MECHANICAL INSTALLATIONS, PIPING AND CLEANING WITH ACIDS  38170 120000 MUSTAFA TUYGUN PROJECT  MANAGER (312) 266 46 42
TEPE İNŞAAT A.Ş.  PASİNLER - ERZURUM – TURKEY BTC PROJECT ARDADAN-ERZURUM-ERZİNCAN SİVAS PUMP STATIONS MECHANICAL INSTALLATION, PIPING AND CLEANING WITH ACIDS  38170 110000 MUSTAFA TUYGUN PROJECT  MANAGER (312) 266 46 41
TEPE İNŞAAT A.Ş.  ÇAYIRLI - ERZİNCAN – TURKEY BTC PROJECT ARDADAN-ERZURUM-ERZİNCAN SİVAS PUMP STATIONS MECHANICAL INSTALLATIONS, PIPING AND CLEANING WITH ACIDS  38170 120000 MUSTAFA TUYGUN PROJECT  MANAGER (312) 266 46 40
TEPE İNŞAAT A.Ş.  KANGAL - SİVAS – TURKEY BTC PROJECT ARDADAN-ERZURUM-ERZİNCAN SİVAS PUMP STATIONS MECHANICAL INSTALLATIONS, PIPING AND WASHING WITH ACIDS  38170 110000 MUSTAFA TUYGUN PROJECT  MANAGER (312) 266 46 39
KAREGE KARADENİZ EGE ELEKTRİK ÜRETİM A.Ş. KEMQALPAŞA - İZMİR – TURKEY KAREGE ENERGY POWER PLANT INSTALLATION OF RADİATOR 38271 1.08E+11 NEZİH ERSOY PROJECT MANAGER 0 212 295 47 37 0 232 877 10 15
VESTEL BEYAZ EŞYA A.Ş. ORGANİZE SANAYİ BÖLGESİ MANİSA-TURKEY REFRIGIRATOR II FACTORY MECHANİCAL INSTALLATIONS 10.12.2004 6.25E+11 SERHAT TOLGA SÖNMEZ DEPARTMENT DIRECTOR 0.236.226 13 00
ZORLU ENDÜSTRİYEL A.Ş. YALOVA – İZMİT-TURKEY YALOVA SILK PAPER KOJENERASYON POWERPLANTI MECHANICAL INSTALLATIONS 22.06.2004 265000 TUNÇ TUNCAY PROJECT MANAGER (212) 456 22 13
VESTEL ELEKTRONİK SAN VE TİC.A.Ş. MANİSA ORGANIZED INDUSTRIAL ZONE – TURKEY OWEN AIR-CONDITION FACTORY MECHANİCAL INSTALLATIONS 38357 380000 SERHAT TOLGA SÖNMEZ DEPARTMENT DIRECTOR 0.236.226 13 00
KAREGE KARADENİZ EGE ELEKTRİK ÜRETİM A.Ş. KEMQALPAŞA - İZMİR – TURKEY NATURALGAS CONNECTION AND DISTRIBUTION of 4 ENGINE  34 MW COGENERATION POWER PLANT  38376 2.6E+10 NEZİH ERSOY PROJECT MANAGER 0 212 295 47 37 0 232 877 10 15
POLİNAS PLASTİK SAN.VE TİC.A.Ş. MANİSA – TURKEY
TEBRİZ - IRAN
BOPP II BUILDING REMOVAL AND IRAN TABRİZ INSTALLATIONS 38459 315000 ENİS TANIK PROJECT MANAGER 0.236.233 04 70
KAREGE KARADENİZ EGE ELEKTRİK ÜRETİM A.Ş. KEMQALPAŞA - İZMİR – TURKEY 34 MW ENERJİ POWER PLANT MECHANİCAL AND PIPING  38497 3.24E+10 NEZİH ERSOY PROJECT MANAGER 0 212 295 47 37 0 232 877 10 15
ETAPAK BASKI AMBALAJ SAN.VE TİC.A.Ş. ATATÜRK ORGANIZED INDUSTRIAL ZONE   İZMİR-TURKEY FACTORY BUILDING VENTILATIONS  38523 35000 ALİ RIZA İŞERİ PROJECT MANAGER 0.232. 463 57 28
ALTINBAŞ HOLDİNG ALYAP GAYRİMENKUL GELİŞTİRME A.Ş. ATATÜRK ORGANIZED INDUSTRIAL ZONE İZMİR-TURKEY ATAK OIL FACTORY MECANİCAL INSTLALLATIONS 38635 778284 KEMAL BALABAN PROJECT MANAGER 0.232.328 31 29
BOTAŞ BAKÜ-TİFLİS-CEYHAN PROJECT DİREKTÖRLÜĞÜ ARDAHAN – TURKEY BTC PROJECT ARDADAN-ERZURUM-ERZİNCAN SİVAS PUMP STATIONS MECHANICAL INSTALLATIONS, PIPING AND CLEANING WITH ACIDS   30.03.2005 35399 HÜSEYİN ÖZCAN PROJECT DIRECTOR (312) 285 44 55
BOTAŞ BAKÜ-TİFLİS-CEYHAN PROJECT DİREKTÖRLÜĞÜ PASİNLER - ERZURUM – TURKEY BTC PROJECT ARDADAN-ERZURUM-ERZİNCAN SİVAS  PUMP STATIONS MECHANICAL INSTALLATIONS, PIPING AND CLEANING WITH ACIDS   30.03.2005 27718 HÜSEYİN ÖZCAN PROJECT DIRECTOR (312) 285 44 55
BOTAŞ BAKÜ-TİFLİS-CEYHAN PROJECT DİREKTÖRLÜĞÜ ÇAYIRLI - ERZINCAN – TURKEY BTC PROJESİ ARDADAN-ERZURUM-ERZİNCAN SİVAS POMPA İSTASYONLARI MEKANİK MONTAJ BORULAMA VE ASİTLE YIKAMA İŞLERİ   30.03.2005 39212 HÜSEYİN ÖZCAN PROJECT DIRECTOR (312) 285 44 55
BOTAŞ BAKÜ-TİFLİS-CEYHAN PROJECT DİREKTÖRLÜĞÜ KANGAL - SİVAS – TURKEY BTC PROJECT ARDADAN-ERZURUM-ERZİNCAN SİVAS PUMP STATIONS MECHANICAL INSTALLATIONS, PIPING AND CLEANING WITH ACIDS    30.03.2005 17370 HÜSEYİN ÖZCAN PROJECT DIRECTOR (312) 266 46 39
ABALIOĞLU YEM SOYA VE TEKSTİL SAN.A.Ş. İZMİR-TURKEY ÇİĞLİ FACTORY PIPING  08.09.2005 14000 HÜDAVERDİ EŞMELİ PURCHASING AUTHORIZED 0.232.479 21 68
ABALIOĞLU YEM SOYA VE TEKSTİL SAN.A.Ş. İZMİR-TURKEY ÇİĞLİ FACTORY PIPING  12.09.2005 8000 HÜDAVERDİ EŞMELİ PURCHASING AUTHORIZED 0.232.479 21 68
ABALIOĞLU YEM FABRİKASI TURGUTLU – MANİSA-TURKEY NATURAL GAS INSTALLATIONS 23.06.2005 53319 CEMİL CEYLAN MECHANICAL ENGINEER 0.232.479 21 68
LEZZET GIDA SAN.VE TİC.A.Ş. İZMİR-TURKEY LNG SYSTEM 29.09.2005 10000 TURHAN SARUHANLI PROJECT MANAGER 0.232.878 19 80
MTSO ORGANİZE SANAYİ BÖLGESİ MANİSA – TURKEY MOSB-YONCA GIDA  STEAM CONDENSER LINE 38880 39041 78850 GÜVEN GÜRTUNCA PROJECTCT MANAGER 0 236 233 18 16
FRESHTEX TEKSTILE FINISHING SERVICES İZMİR-TURKEY RENEWAL OF STEAM, CHILLED WATER, HOT WATER, SOFTENED WATER, RAW WATER PIPING 38771 38919 72000 SEYFİ YILDAN PURCHASING DIRECTOR 0 232  376 78 66
NATO İZMİR HAVA UNSUR KOMUTANLIĞI  SATIN ALMA VE KONTRAT ŞUBESİ İZMİR-TURKEY NATO  DISKO-HIT BUILDING PIPING 38777 38808 57000 MEHMET BÜYÜKNİSAN PURCHASING DIRECTOR 0 232 
METESAN ELEKTRİK MALZEMELERİ SAN VE TİC.A.Ş. İZMİR-TURKEY METESAN NEW ÇİĞLİ FACTORY MECHANICAL INSTALLATIONS 38834 38937 98000 ABDULLAH BEKÇİ PURCHASING DIRECTOR 0 232 376 71 71
ÖZÇİN BAKIR SANAYİ VE TİC.LTD.ŞTİ VAN – TURKEY
ERBİL - IRAQ
34 MW VAN ERÇİŞ  4 MOTOR POWER PLANT REMOVAL AND INSTALLATION TO  IRAK ERBİL 38866 39074 360000 MEHMET SUNER PROJECTCT MANAGER 0 212 320 01 10
AKSA ENERJİ ÜRETİM A.Ş. KAYSERİ – TURKEY
SINJAR - IRAQ
50 MW KAYSERİ  4 ENGINE  POWER PLAND REMOVAL AND INSTALLATION TO IRAK SİNCAR 10.03.2006 01.06.2006 280000 KAAN GÖRENEK PROJECT MANAGER 0 212 550 53 36
WARTSILA ENPA DIŞ TİCARET A.Ş. GİRNE -CYPRUS KIB-TEK 4 X 18V46 POWER PLANT MECHANICAL INSTALLATIONS  39020 39232 1300000 UFUK BERK GENERAL MANAGER 0 212 327 15 30
ALİAĞA ÇAKMAKTEPE ENERJİ ÜRETİM A.Ş  İZMİR – TURKEY ÇAKMAKTEPE 4 X 18V46 POWER PLANT CONSORTIUM PARTNER - ONSHORE CONTRACTOR 38882 39383 4350000 FEHMİ  GENÇER DIRECTOR 0 232 463 23 94   
WARTSILA ENPA DIŞ TİCARET A.Ş. GAZİANTEP – TURKEY AKTEKS POWER PLANT, CAMİS ÇAYIROVA AND CAMİŞ TOPKAPI POWERPLANT REMOVAL 39264 39380 666.000,00.-EURO UFUK BERK DIRECTOR 0 212 327 15 30
VESTEL BEYAZ EŞYA A.Ş. MANİSA -TURKEY WASHING MACHINE FACTORY CONSTRUCTION - FIRE SYSTEM 39133 39396 72663.42 İLKER ÇOLAK DEP. MANAGER 0 236 226 30 00
KLİMASAN KLİMA SAN TİC A.Ş. İZMİR-TURKEY KLİMASAN A.Ş FACTORY MECHANICAL INSTALLATIONS 39143 39447 450000 ALİ METE KÜÇÜKKAYA DIRECTOR 0 232 376 72 23
GENTA TASARIM MÜHENDİSLİK.LTD.ŞTİ DENİZLİ – TURKEY DENİZLİ TERAS PARK AVM MECHANICAL INSTALLATIONS 39177 39411 2.700.000,00.-USD ÇAĞIN ŞEN DIRECTOR 0 312 446 42 32
KARKEY KARADENİZ ELEKTRİK ÜRETİM A.Ş. BATMAN – TURKEY BATMAN - FERNAS BASİNER 18 MB 430 M MİRLESS BLACKSTONE DİESEL GENSET AND EQUIPMENTS FACTORY REMOVEL AND INSTALLATION TO SİLOPİ 39234 39813 700.000.-YTL ALİCAN TAKUNYACI DIRECTOR 0 212 295 47 37
WARTSILA FINLAND OY ÇORLU – TURKEY SUPPLY DELIVERY,DESING,ERECTION AND INSTALLATION,OF MECHANICAL AND ELECTRICAL WORK FOR CAN ENERJI POWER PLANT   39375 39568 310.000.-EURO UFUK BERK DIRECTOR 0 212 327 15 30
PETROL OFİSİ A.Ş. ALİAĞA-İZMİR-TURKEY INSTALLATION OF NEW BOTTOM FILLING ISLAND 39480 39614 356.516.-USD ABDULLAH YALTIRIK DIRECTOR
AKSA ENERJİ ÜRETİM A.Ş. MANİSA -TURKEY MANİSA POWER PLANT MECHANICAL INSTALLATIONS  39450 39629 950.000.-YTL  MEHMET KAZANCI DIRECTOR 0 212 550 53 36
WARTSILA ENPA DIŞ TİCARET A.Ş. GİRNE -CYPRUS KIBTEK II POWER PLANT MECHANICAL INSTALLATIONS 39449 39692 1.100.000.-EURO  UFUK BERK DİRECTOR 0 212 327 15 30
AKDENİZ AKARYAKIT A.Ş. ANTALYA – TURKEY ANTALYA STORING STATION PRODUCTION AND INSTALLATIONS  39601 31,12,2008 4.750.000.-USD SELAMİ TOPALOĞLU DIRECTOR
KLİMASAN KLİMA SAN TİC A.Ş. İZMİR – TURKEY KLİMASAN FACTORY MECHANICAL INSTRUCTIONS 39553 39813 255.000.-YTL MURAT OKUR PROJECT MANAGER 0 232 376 72 23
AKSA ENERJİ ÜRETİM A.Ş. MANİSA – TURKEY MANİSA POWER PLANT II MECHANICAL INSTALLATIONS  39727 39788 210.000.-YTL MEHMET KAZANCI GENERAL MANAGER 0 212 550 53 36
ANTALYA ENERJİ ÜRETİM A.Ş. ANTALYA -TURKEY ANTALYA POWER PLANT MECHANICAL INSTALLATION 2 AND 3 39783 39963 575.000.-TL MEHMET GİREP GENERAL MANAGER 0 242 258 19 33
AKSA ENERJİ ÜRETİM A.Ş. MANİSA – TURKEY MANİSA COMBINE CYCLE POWERPLANT 12 WASTE HEAT BOILERS,STEAM TURBİNE,COOLING TOWER PUMP INSTALLATIONS 39945 39994 235.000.-TL MEHMET KAZANCI GENERAL MANAGER 0 212 550 53 36
ZORLU DOĞAL ELEKTRİK ÜRETİM A.Ş. KARS-TURKEY TURBINE AND GENERATOR, COOLING SYSTEM REHABILITATION WORKS 39945 39994 169.341,41.-EURO GALİP ÜNLÜ PROJECT MANAGER 0 212 456 23 00
SİPİL İNŞAAT A.Ş. MANİSA – TURKEY SCHNEIDER ELECTRIC FACTORY MECHANICAL INSTALATIONS  39885 40137 1.533.000.-TL ERDEM BEY  PROJECT MANAGER  
POLİBAK A.Ş. ÇİĞLİ / İZMİR / TURKEY  POLİBAK ÇİĞLİ FACTORY 4th LINE MECHANICAL INSTALLATIONS  39843 40086 225.000.-TL BÜLENT ÇELİK FACTORY MANAGER  
WARTSILA ENPA DIŞ TİCARET A.Ş. TUZLA - İSTANBUL SHIP MAINTENANCE SHOP MAIN MACHINE MAINTENANCE AND REPAIR  39965 40178 470.000.-TL UFUK BERK GENERAL MANAGER  
ÇAKMAKTEPE ENERJİ ÜRETİM A.Ş. ALİAĞA- İZMİR ÇAKMAKTEPE POWERPLANT 2nd STAGE MECHANICAL INSTALLATIONS  39815 40086 1.500.000.-EURO       ATIL AKKAN                    ŞÜKRÜ AKKAN  GENERAL MANAGER 0 232 463 23 94
ÇAKMAKTEPE ENERJİ ÜRETİM A.Ş. ALİAĞA- İZMİR-TURKEY ALOSBİ NATURAL GAS WORKS 40152 40283 154.000.-EURO ŞÜKRÜ AKKAN GENERAL MANAGER
İLTEKNO İLERİ TEKNOLOJİ MÜHENDİSLİK A.Ş. ISPARTA TURKEY - IRAK BEIJI ISPARTA POWERPLANT DISMANTLING OPERATIONS AND INSTALLATIONS TO IRAK BEIJI  40269 40420 250.000.-EURO COŞKUN  ÖZALP PROJECT MANAGER
AKSA ENERJİ ÜRETİM A.Ş. SAMSUN-TURKEY 16,5 MW SAMSUN POWERPLANT DISMENTLING OPERATIONS OF 18V46 MOTOR 40269 40328 42.000.-TL ALİ RIZA ÖNER PROJECT MANAGER
AKSA ENERJİ ÜRETİM A.Ş. SİNCAR-IRAQ 40 MW IRAK SİNCAR POWERPLANT DISMANTLING OPERATIONS OF 3 MOTORS EXCLUDING ELECTRIC FACILITIES 40269 40359 120.000.-TL ALİ RIZA ÖNER PROJECT MANAGER
RASA ENERJİ ÜRETİM A.Ş. VAN - TURKEY RUSTPROOF TANK PRODUCKTION AND INSTALLATION 40269 40328 119.250.-TL ALİ RIZA ÖNER PROJECT MANAGER
RASA ENERJİ ÜRETİM A.Ş. VAN - TURKEY TURBINE AND REFINING CONSTRUCTION STEEL PRODUCTION AND INSTALLATIONS 40269 40328 42.000.-TL ALİ RIZA ÖNER PROJECT MANAGER
POLTEKS İNŞAAT A.Ş. KIRIKKALE-TURKEY  DOHUK-IRAK 150 MW KIRIKKALE COMBINE CYCLE POWERPLANT DISMANTLING OPERATIONS AND INSTALLATIONS TO IRAK DOHUK 40269 41051 7.250.000.-USD HÜSEYİN SÜNGER  PROJECT MANAGER 0532 324 44 73
GÜÇ SANTRALLERİ A.Ş. BANDIRMA - BALIKESİR-TURKEY BANDIRMA NATURAL GAS COMBINE CYCLING PLANT 40298 40435 160.000.-EURO BÜLENT ÖZGÜREL GENERAL MANAGER
OPET PETROLCÜLÜK A.Ş. GİRESUN-TURKEY GİRESUN ESPİYE TERMINAL INNER AND OUTER FACILITIES JET-A1 PIPELINE  40278 40344 706.000.-USD SARSILMAZ KAZEL PROJECT MANAGER 21500
WARTSILA FINLAND OY  TEKİRDAĞ-TURKEY CAN POWERPLANT MECHANICAL AND ELECTRICAL INSTALLATIONS 40269 40452 955.800.-EURO UFUK BERK GENERAL MANAGER
WARTSILA ENPA DIŞ TİC A.Ş. KÜTAHYA TURKEY HG POWERPLANT MECHANICAL AND ELECTRICAL INSTALLATIONS 40269 40452 2.055.000.-EURO UFUK BERK GENERAL MANAGER
THY OPET A.Ş. İSTANBUL-TURKEY OPET İSTANBUL ATATÜRK AIRPORT FILLING STATION PIPELINE PRODUCTION AND INSTALLATIONS 40330 40451 2229330
AKSA ENERJİ ÜRETİM A.Ş. CYPRUS KIBRIS POWERPLANT MECHANICAL INSTALLATIONS 40269 40481 700.000.-TL ALİ RIZA ÖNER PROJECT MANAGER
İLTEKNO İLERİ TEKNOLOJİ MÜHENDİSLİK A.Ş. JTI POWERPLANT INSTALLATIONS - İZMİR  2X2 MW JTI TABACCO TRIGENERATION POWERPLANT MECHANICAL INSTALLATIONS 01.06.2010. 40420    200.000.-EURO COŞKUN  ÖZALP PROJECT MANAGER
PANCAR ELEKTRİK ÜRETİM A.Ş. PANCAR O.S.B. İZMİR 40 MW PANCAR COGENERATION POWERPLANT MECHANICAL INSTALLATIONS 40371 40574 560.000.-EURO METİN ERSAN REGION MANAGER
MOSB ENERJİ ELEKTRİK ÜRETİM LTD.ŞTİ ORGANIZED INDUSTRIAL ZONE MANİSA GAS AND COOLING PIPING WORKS 40369 40451 380.000.-TL GÜVEN GÜRTUNCA CENTRAL MANAGER
OKA ENERJİ ÜRETİMİ İÇİN MÜHENDİSLİK HİZMETLERİ A.Ş. MOSB MANİSA  TECHNOLOGICAL BOILER PRODUCTION AND INSTALLATIONS 40396 40602 1.500.000.-TL OGÜN ÖZSOY GENERAL MANAGER
ÇAKMAKTEPE ENERJİ ÜRETİM AŞ. İZMİR-TURKEY 28,8 MW NATURAL GAS COGENERATION POWER PLANT 2x14,4 MW STEAM TURBINES MECHANICAL INSTALLATION 40365 40664 850000 ŞÜKRÜ KIZILKAYA POWER PLANT MANAGER
MOSB ENERJİ ELEKTRİK ÜRETİM LTD.ŞTİ ORGANIZED INDUSTRIAL ZONE MANİSA 2X25 MW NATURAL GAS TURBINE SYSTEM MECHANICAL INSTALLATIONS AND CONSTRUCTIONS 40369 40693 2096000 GÜVEN GÜRTUNCA CENTRAL MANAGER
AKSA ENERJİ ÜRETİM AŞ. SAMSUN-TURKEY NATURAL GAS COGENERATION POWER PLANT 7 AALBORG HRSGs MECHANICAL INSTALLATION 40544 40756 142000 ALİ RIZA ÖNER PROJECT MANAGER
TİRE ENERJİ ÜRETİM AŞ. İZMİR-TURKEY 60 MW TİRENDA NATURAL GAS COGENERATION POWER PLANT 6x20V34SG MECHANICAL INSTALLATION  40725 40770 1252816 CELAL TUĞCU PROJECT MANAGER 0232 463 98 11
ODAŞ ELEKTRİK ÜRETİM AŞ. ŞANLIURFA-TURKEY 55,5 MW POWER PLANT 3x18V50SG GAS MACHINES MECHANICAL INSTALLATION 40680 40851 375000 HÜSEYİN GÜLOĞLU PROJECT MANAGER 0533 763 34 68
YENİ UŞAK ENERJİ ÜRETİM AŞ. UŞAK-TURKEY 8,5 MW NATURAL GAS POWER PLANT, 1x20V34SG GAS MACHINES MECHANICAK INSTALLATION 40754 40897 135000 LÜTFÜ UYSUN POWER PLANT MANAGER 0276 253 34 60
YEŞİLYURT ENERJİ ÜRETİM AŞ. SAMSUN-TURKEY 250 MW NATURAL GAS COGENERATION POWER PLANT, 12x18V50SG GAS MACHINES AND 20 MW STEAM TURBINE MECHANICAL INSTALLATION 40725 4000000 ÇETİN LİVAOĞLU PROJECT MANAGER 0362 256 23 30
HIDRONEHIR ELEKTRİK ÜRETİM ve TİCARET A.Ş. ANKARA-TURKEY KARABÜK OSB POWER PLANT PROJECT COST OF SERVICE 40847 205000 HİLMİ BAKKALCI PROJECT MANAGER 0312 441 31 41
DEDELİ DOĞALGAZ ELEKTRİK ÜRETİM TİC. A.Ş. BİLECİK-TURKEY 117 MW NATURAL GAS COGENERATION POWER PLANT 13x20V34SG GAS MACHINES MECHANİCAL INSTALLATION 40623 40993 1725000 HALİL ÇİFTÇİ PROJECT MANAGER 0530 640 95 25
DEDELİ DOĞALGAZ ELEKTRİK ÜRETİM TİC. A.Ş. AFYON-TURKEY 117 MW NATURAL GAS COGENERATION POWER PLANT 13x20V34SG GAS MACHINES MECHANİCAL INSTALLATION 40623 41052 1725000 HALİL ÇİFTÇİ PROJECT MANAGER 0530 640 95 25
SINAMO ENERGY CONSERVATION LTD. AYDIN-TURKEY 5,5 MW WHR TURBINE PROJECT for BATISÖKE ÇİMENTO SANAYİ AŞ. ERECTION WORKS 40801 1.750.000.-USD BATISÖKE ÇİMENTO DUAN BAOSHAN PROJECT MANAGER 0536 911 61 26
ALKEG ENERJİ SANAYİ ve TİC. AŞ. IZMIR-TURKEY HEATING SYSTEM INSTALLATION 41257 40940 46245 YILDIZFER KEMALOĞLU ALTIN PROJECT MANAGER 0232 376 70 13
İZMİR SERBEST BÖLGE KURUCU VE İŞLETME AŞ. İZBAŞ-IZMIR-TURKEY MAIN NATURAL GAS PIPELINE 31.02.2012 41053 58000 PROJECT MANAGER
KESKİNOĞLU TAV. VE DAM. İŞL. SAN TİC. AŞ. AKHİSAR-MANİSA NEW DÖNER FACTORY MECHANICAL INSTALLATION 40942 41061 145000 PINAR MUSTAFAOĞLU PURCHASING SUPERVISOR 0236 427 25 72
KESKİNOĞLU TAV. VE DAM. İŞL. SAN TİC. AŞ. AKHİSAR-MANİSA NEW PASTORİZED BUILDING INTERNAL MECHANICAL INSTALLATION PROJECT 40942 41061 15000 PINAR MUSTAFAOĞLU PURCHASING SUPERVISOR 0236 427 25 72
ODAŞ ELEKTRİK ÜRETİM AŞ. ŞANLIURFA-TURKEY 74 MW POWER PLANT 4x18V50SG GAS MACHINES MECHANICAL INSTALLATION, 500 m3 TANK, STEEL STRUCTURE, SIDING MANUFACTURING AND INSTALLATION 40913 41090 1000000 HÜSEYİN GÜLOĞLU PROJECT MANAGER 0533 763 34 68
RASA ENERJİ ÜRETİM AŞ. ŞANLIURFA-TURKEY COGENERATION POWER PLANT STEEL AND INSTALLATION WORKS (12 PCS HEAT RECOVERY BOILER,A STEAM TURBINE AND A GENERATOR INSTALLATION, A DEARATOR PRODUCTION AND INSTALLATION) 40949 41105 1455000 ALİ RIZA ÖNER PROJECT MANAGER
ZORLU DOĞAL ELEKTRİK ÜRETİMİ A.Ş. DENİZLİ-TURKEY KIZILDERE GEOTHERMAL POWER PLANT COOLING TOWER ASSEMBLY 41155 310000 PROJECT MANAGER
AKSA ENERJİ ÜRETİM A.Ş. SAMSUN-TURKEY  CYPRUS SAMSUN, 16,5 MW 1 PIECES 18V46 WARTSILA ENGINE, ALBORG BOILER, DENOX SYSTEM AND AUXILARY EQUIPMENT DISMANTLING OPERATIONS AND INSTALLATIONS TO CYPRUS 41175 235000 ALİ RIZA ÖNER PROJECT MANAGER
HG ENERJİ ELEKTRİK ÜRETİM AŞ. GEDİZ/KÜTAHYA-TURKEY 5,5 MW STEAM TURBINE INSTALLATION 41180 105000 PROJECT MANAGER
ETİKROM / ELAZIĞ 5,5 MW  WHR SYSTEM  INSTALLATION 41197 41815 8000000 YÜKSEL BÖKE PROJECT MANAGER 0424 627 80 04
İZMİR KALIP SAN.TİC.LTD.ŞTİ MANISA/MOSB MECHANICAL INSTALLATION WORKS 41172 179912 PROJECT MANAGER
DEDELİ DOĞALGAZ AFYON VE BİLECİK NATURAL GAS COGENARATION POWER PLANTS, WASTE HEAT RECOVERY BOILERS
AND STEAM TURBINE INSTALLATIONS ENGINEERING, CONSULTANCY AND MANUFACTURING WORKS
41199 6200000 HALİM EREOĞLU PROJECT MANAGER 0530 290 08 42
PANCAR ELEKTRİK ÜRETİM A.Ş. İZMİR/ TURKEY  5 MW NATURAL GAS COGENARATION POWER PLANT, WASTE HEAT RECOVERY BOILERS
AND STEAM TURBINE INSTALLATIONS ENGINEERING, CONSULTANCY AND MANUFACTURING WORKS
41225 2750000 GÖKHAN ÖZDEMİR PROJECT MANAGER
BATIÇİM ÇİMENTO  İZMİR/ TURKEY HEAT EXCHANGEARS OF ROTARY FURNACES INSTALLATION  41225 180.000,00 $ ERHAN BİÇER PROJECT MANAGER
TEKNO ENERJİ TEKNO-BİLEBK 1 PCS. STEAM TURBINE GENERATOR SET SUPPLY AND ERECTION 41334 1500000 Orkun ARIKAN PROJECT MANAGER
TEKNO ENERJİ BİLECİK 1 PCS. STEAM TURBINE  COOLING SYSTEM ERECTION  41506 275000 Orkun ARIKAN PROJECT MANAGER
AKSA SAMSUN 16,5 MW  1X18V46 EG-SET DISMANTLING 41596 68000 KAAN GÖRENEK PROJECT MANAGER
AKSA SAMSUN-KIBRIS 1AD AKBORG KAZAN 7 AD. DİV. DIMANTLING TO KIBRIS INSTALLATION 41442 165000 KAAN GÖRENEK PROJECT MANAGER
OOO Resursİnvest  ÇORLU-ELSE TESİSLERİ 2 X 1,58MW CAT 3516C ENGINE  DISMANTLING TO RUSYA STAVROPOL  41582 995000
OYAK GRUP BOLU ÇİMENTO 6,5 MW WHR TURBINE PROJECT for BOLU ÇİMENTO SANAYİ AŞ. ERECTION WORKS 41604 4265000 TARIK TUNCER PROJECT MANAGER 0374 226 50 60
OYAK GRUP ASLAN ÇİMENTO 6,5 MW WHR TURBINE PROJECT for ASLAN ÇİMENTO SANAYİ AŞ. ERECTION WORKS 41604 3675000 OZAN KESKİN PROJECT MANAGER
CEMDAĞ AYDINLATMA CEMDAĞ  AKHİSAR ELEKTRİK  ÜRETİM  A.Ş 50 MW POWER PLANT CIVIL WORKING 41644 2100000 MUSTAFA  CEM PROJECT MANAGER
CAN  ENERJİ TEKİRDAĞ-TURKEY 20 MW  2X2034SG  WARTSİLA  NATUREL GAS EG-SET INSTALLING 10.09.2014 120000 PROJECT MANAGER
AKSA ENERJİ MAGOSA /KKTC STEAM LINE  MANUFACTURING AND INSTALLING 41731 50000 RECEP MÜSELLİM PROJECT MANAGER
TEKNO ENERJİ BİLECİK STEAM TURBINE  STEEL STRUCTURE  MANUFACTURING AND INSTALLING 41741 175000 KAZIM BAYÖLKEN PROJECT MANAGER
WARTSILA FINLAND PİPE RACK  41885 55000 SWANTE BENGS PROJECT MANAGER
POLİBAK PLASTİK FİLM SAN. VE TİC. A.Ş. ÇİĞLİ/İZMİR 5. LINE  STEEL STRUCTURE AND  PIPING WORKS 41976 1231604
POLİNAS AŞ. MANİSA NATUREL GAS PIPING 42044 107000 CAN UYSAL PROJECT MANAGER
AKSA ENERJİ SAMSUN 18V50SG WARSİLA EG-SET+BOILER DISMANTLING 42072 42124 150000 ALGAN SARAÇOĞLU PROJECT MANAGER
AKSA ENERJİ HAKKARİ 30 MW 4X20V32 WARTSİLA EG-SET DISMANTLING  42072 42178 500000 ALGAN SARAÇOĞLU PROJECT MANAGER
AKSA ENERJİ SİİRT 7,5 MW 1X20V32 WARTSİLA EG-SET DISMANTLING 42049 42184 80000 ALGAN SARAÇOĞLU PROJECT MANAGER
AKSA ENERJİ URFA 18V50SG WARSİLA EG-SET+BOILER ERECTION 42072 42227 300000 RECEP MÜSELLİM PROJECT MANAGER
TAKYAPI IRAQ PRESSURE VESSEL MANUFACTURING 42212 42323 64.000,00 $ CAN  USLU PROJECT MANAGER
HİDRODİZAYN  LTD. ŞTİ. İZMİR TANK   MANUFACTURING   42355 42425 67500 VOLKAN TOPUK PROJECT MANAGER
GEMSAN AŞ. ALİAĞA STAR REFINERY 4.430 TON STEEL STRUCTURE INSTALLING 42208 42466 1.490.777,00 $ AKCAN ODABAŞ PROJECT MANAGER
POLİBAK İZMİR NATRUREL GAS  PIPING 42419 42514 89500 AKIN BİRCAN PROJECT MANAGER 0532 310 66 89
POLİBAK İZMİR HOT OIL BOILER/CHILLER/COOLING TOWER REVISIONS AND PIPINGS 42444 42536 346000 AKIN BİRCAN PROJECT MANAGER 0532 310 66 89
CEYTEK A.Ş TORBALI/İZMİR TEZOL KAĞIT  6,7  MW  NATUREL GAS TRIGENERATION POWER PLANT  INSTALLATION 42291 42639 693044 YAKUP YASA GENERAL MANAGER
POLİBAK AŞ. İZMİR 5. PRODUCTION LINE EQUIPMENT  INSTALLING 41982 42840 3242500 AKIN BİRCAN PROJECT MANAGER 0532 310 66 89
CEYTEK AŞ. BANVİT/BANDIRMA 3X3,35 MW  TRIGENARATION   POWER  PLANT INSTALLING 42401 42814 1877147 YAKUP YASA GENERAL MANAGER
GENTA AŞ. ALİAĞA STAR REFINERY  MCR AIR CONDTIONING  PIPE  INSTALLING 42566 42816 70.000,00 $ FERİT ÇÖMEZ GENERAL MANAGER
ATATÜRK ORGANIZED INDUSTRIAL ZONE İZMİR-TURKEY ATAK OIL FACTORY EXTENSION MECANİCAL INSTLALLATIONS 42896 43084 140.000 $ ÖNDER CİN PROJECT MANAGER 0.232.328 31 29
 

3.jpg